Case Studies

Discover a library of detailed case studies demonstrating our extensive experience.

Case Study

9,000,000kWh+ annual savings
Payback £810,000 annually

Case Study

7% reduction in energy usage
Over 285,000 kWh saved per year
More than £25,000 in savings per annum
Payback under 4 years

Case Study

109 tCO₂ total carbon reduction
472 MWh total energy savings
1250 kVA transformer rating

Case Study

Electricity usage reduced by 3.5%
Annual savings of 99,176 kWh
Site voltage reduced from 244V to 230V

Case Study

272,949 kWh savings reduction annually
£22,500 annual savings
12 tCO₂ reduced annually

Case Study

14.4 tCO₂ in annual carbon savings
£12,316 annual financial savings
Annual carbon savings of 68,426 kWh (transformer losses + voltage regulations)

Case Study

Infrastructure includes an 11kV network with 22 substations and 26 supply transformers

Case Study

Predicted 304,000kWh savings over 5 years
Annual cost savings of £7,300 for a single transformer replacement

Case Study

6% reduction in electricity consumption
£31,000 annual savings
3 years payback