The site utilises three liquid-cooling Battery Energy Storage System units based on Lithium Iron Phosphate (LFP) from Contemporary Amperex Technology Co. Limited, CATL, and skid-mounted SMA inverters. Developed by ForePower and constructed by Edina, the one-hour duration site has a capacity of 10MW and is expected to provide balancing services to the grid to accelerate the renewables transition and provide system flexibility.
We supplied the site with a 500kVA 33kV/400V Wilson Auxiliary Transformer with a marshalling box connecting an oil temperature indicator, winding temperature indicator, pressure relief device, and a magnetic oil gauge.