To support the 18MW capacity of the site, we supplied and installed a 20MVA 22/11kV Wilson Power Transformer. This project was successfully completed in collaboration with RJ Power Group, with our expert site team managing the offloading of the transformer onto the plinth, completing the full installation, and conducting pre-commissioning tests.
The transformer is fitted with a range of ancillaries, including a wall-mounted AVR panel, pressure relief device, conservator and Buchholz relay, and magnetic oil gauge, ensuring optimal performance and safety.
The onsite Wilson Power Transformer plays a crucial role in supporting Feltham Server Farm’s unique power demands by providing a stable, energy-efficient solution capable of handling high-load IT and AI operations. Its advanced features help regulate voltage fluctuations, ensuring uninterrupted performance for the facility’s critical infrastructure. With its robust design and efficiency-driven components, the transformer enhances reliability while optimising energy consumption, making it a vital asset in maintaining LON1’s seamless operations.