This high-voltage connection is a project for four industrial facilities at PLP MK in South Caldecotte, Milton Keynes. The 135-acre site features four units and office spaces, 17 acres of lowland meadows, and 3.8 kilometers of pedestrian and cycle paths integrated into the Milton Keynes Redway network. Winvic undertook the construction work, aiming to achieve Net Zero Carbon in construction, aligning with the UK Green Building Council's Net Zero Buildings Framework. Measures include sourcing low-carbon materials, utilising green suppliers, and employing local labor. The buildings are designed to support tenants in achieving Net Zero Carbon operations, with roofs capable of accommodating up to 100% photovoltaic panels.