The Ark Hammersmith London

The Ark infrastructure upgrade

The Ark in Hammersmith, London, is a landmark office building designed by Swedish architect Ralph Erskine and first opened in 1992. Recognised for its distinctive curved glass façade and innovative design, the building has long been a symbol of modern architecture in West London. In 2023, The Ark underwent a major refurbishment to align with today’s workforce's demands, focusing on sustainability, comfort, and flexibility to promote a healthier work–life balance.

Sector

Facilities

Contractor

RJ Power

End User

The Ark

Location

London

Scope of Work

Two 1250kVA 11kV/433V Wilson T2 Ecotrans® Distribution Transformers with CN2 Circuit Breakers

As part of an electrical infrastructure upgrade, Wilson Power Solutions supplied two 1250kVA 11kV/433V Wilson T2 Ecotrans® Distribution Transformers as replacements. Each unit features a high-voltage de-energised tap changer and prismatic oil level indicator, close-coupled with Schneider CN2 circuit breakers. The transformers were delivered and offloaded on-site using a HIAB, with the installation managed by electrical contractor RJ Power.

Replacing ageing transformers with modern, energy-efficient alternatives not only enhances reliability and performance but also reduces ongoing energy losses and operational costs. For a building like The Ark, where sustainability and occupant wellbeing are central to its design, maintaining efficient power infrastructure is key to supporting future demand, lowering carbon emissions, and ensuring long-term resilience.

Wilson T2 distribution transformer at The Ark Hammersmith in London Wilson T2 distribution transformer at The Ark Hammersmith in London Wilson T2 distribution transformer at The Ark Hammersmith in London Th Ark Hammersmith, London